Terracotta-toned entry and mudroom floor

Entry and mudroom flooring in large terracotta-toned porcelain with a built-in bench

Location
Purcellville, VA
Completed
September 2024
Duration
3 days + 3 days + 1 day
Category
Flooring
Representative entry and mudroom with a continuous terracotta-toned porcelain floor and built-in oak bench

Representative concept image — not a customer project photograph

Representative project.This record describes the scope, materials, and construction method of work we carry out. It is not a specific customer’s completed job, and the photography has not been shot yet. Ask to see finished work in person.

Overview

An entry and mudroom floor laid so the pattern runs through the opening between the two rooms without a break, cut, or threshold.

Continuity through a doorway is a layout decision made before the first tile is set. Once the field is running, it is too late to fix.

What the owners wanted

  • A hard-wearing floor for a family entrance
  • Warmth in a room that is mostly used in winter coats
  • Continuity between the two rooms

Services performed

  • Subfloor preparation
  • Large-format porcelain flooring
  • Pattern continuity through openings
  • Transitions
Request something similar

Existing conditions

What we found

  • Two different floor finishes meeting at a timber threshold
  • Subfloor stepped by 12 mm between rooms

Design direction

The decisions that shaped it

  • One large format across both rooms
  • Joint lines running with the direction of travel
  • No threshold at the opening

Problem solving

What had to be worked out

Challenges

  • The step between rooms had to disappear without raising the floor at the exterior door.

How they were solved

  • The lower room was built up with levelling compound feathered towards the door so the finished floor arrived at the threshold at exactly the right height.

How it was built

Construction sequence

  1. 01

    Survey

    Establish a shared datum across both rooms.

  2. 02

    Levelling

    Build up the lower room and feather to the exterior threshold.

  3. 03

    Layout

    Set out so a full tile runs through the opening.

  4. 04

    Installation

    Set, grout, and seal.

Timeline on site

Preparation and levelling
3 days
Installation
3 days
Finishing
1 day

Working days on site, excluding material lead times and the days between trades.

Finished

The completed room

The tile pattern turning the corner into the hallway without a break
The tile pattern turning the corner into the hallway without a break

Your project

Something like this, in your house.

Tell us about the room and we will tell you what is involved, what it is likely to cost, and how long it would take.

Have photographs or a drawing? Upload them with your request — it usually saves a visit.