Heated porcelain floor across an open plan

Large-format porcelain flooring with electric underfloor heating across kitchen, dining, and hall

Location
Reston, VA
Completed
February 2025
Duration
4 days + 3 days + 2 days + 7 days + 3 days
Category
Flooring
Representative open-plan interior concept with large-format porcelain flooring and a flush transition to oak

Representative concept image — not a customer project photograph

Representative project.This record describes the scope, materials, and construction method of work we carry out. It is not a specific customer’s completed job, and the photography has not been shot yet. Ask to see finished work in person.

Overview

Sixty-two square metres of 900 × 900 mm porcelain across three connected rooms, running in one direction with no thresholds between spaces.

A floor at this scale is a flatness problem before it is a tiling problem. The whole area was surveyed, mapped, and levelled before any heating or tile went down.

What the owners wanted

  • One continuous floor across three rooms
  • Warmth underfoot in a north-facing kitchen
  • No thresholds or level changes

Services performed

  • Subfloor assessment and levelling
  • Electric underfloor heating
  • Large-format porcelain flooring
  • Transitions and thresholds

Materials used

Uncoupling
Uncoupling membrane over the levelled substrate
Request something similar

Existing conditions

What we found

  • Three different floor finishes at three different heights
  • Timber subfloor with visible deflection between joists
  • A 22 mm variation in level across the full area

Design direction

The decisions that shaped it

  • One tile, one direction, minimal joints
  • Movement joints placed at the room perimeters and at the structural break
  • Flush metal transition only where the floor meets carpeted stairs

Problem solving

What had to be worked out

Challenges

  • Deflection between joists exceeded what a 900 mm porcelain panel tolerates.
  • Levelling across 62 m² in a single pour was not practical with the access available.

How they were solved

  • An additional layer of structural panel was added to stiffen the deck before levelling.
  • The area was levelled in three sections with datum points transferred between them so the finished plane stayed continuous.

How it was built

Construction sequence

  1. 01

    Survey

    Laser-map the whole area and record deflection between joists.

  2. 02

    Structure

    Stiffen the deck, then level in sections to a shared datum.

  3. 03

    Heating

    Lay cable, test continuity, embed in compound, test again.

  4. 04

    Tile

    Uncoupling layer, then set with a levelling system throughout.

Timeline on site

Survey and structural work
4 days
Levelling
3 days
Heating installation
2 days
Tile installation
7 days
Grouting and finishing
3 days

Working days on site, excluding material lead times and the days between trades.

During the build

Heating cable set in self-levelling compound before tiling
Heating cable set in self-levelling compound before tiling

Finished

The completed room

Heating cable set in self-levelling compound before tiling
Heating cable set in self-levelling compound before tiling
A flush metal transition between tile and engineered oak flooring
A flush metal transition between tile and engineered oak flooring

Your project

Something like this, in your house.

Tell us about the room and we will tell you what is involved, what it is likely to cost, and how long it would take.

Have photographs or a drawing? Upload them with your request — it usually saves a visit.