Skip to main content
AltesoraTile · Stone · Bathrooms

Tile & Stone

Stone feature wall in a stair hall

Textured stone cladding to a double-height stair hall wall

Location
McLean, VA
Completed
June 2024
Duration
3 days + 6 days
Category
Tile & Stone
Representative double-height stair hall with a precisely coursed natural stone feature wall

Representative concept image — not a customer project photograph

Representative project.This record describes the scope, materials, and construction method of work we carry out. It is not a specific customer’s completed job, and the photography has not been shot yet. Ask to see finished work in person.

Overview

A double-height wall clad in textured stone, lit from a concealed detail at the head of the wall so the surface reads differently through the day.

Texture only works when it is lit correctly. The lighting position was agreed with the electrician before the substrate went up.

What the owners wanted

  • Give a tall, blank wall some depth
  • Work with the existing daylight rather than against it

Services performed

  • Substrate preparation
  • Stone cladding
  • Concealed lighting coordination

Materials used

Request something similar

Existing conditions

What we found

  • Painted drywall, 6.2 m tall, with no access for scaffolding through the front door

Design direction

The decisions that shaped it

  • Textured stone in a single tone
  • Concealed grazing light from above

Problem solving

What had to be worked out

Challenges

  • Access. Scaffolding had to be built inside the hall and worked around daily use of the stairs.

How they were solved

  • A tower was built and struck at the end of each working day so the stairs stayed usable overnight.

How it was built

Construction sequence

  1. 01

    Access

    Erect and plan around a strikable tower.

  2. 02

    Substrate

    Batten and board to a plumb plane.

  3. 03

    Cladding

    Set courses from a laser datum over the full height.

Timeline on site

Access and substrate
3 days
Stone installation
6 days

Working days on site, excluding material lead times and the days between trades.

Your project

Something like this, in your house.

Tell us about the room and we will tell you what is involved, what it is likely to cost, and how long it would take.

Have photographs or a drawing? Upload them with your request — it usually saves a visit.